| Project: | Hellenic Petroleum - PP Plant 176 kT/Y |
| Client: | TCM Sp.A. |
| Country: | Greece |
| Date: | 1999-2002 |
| Job assigned: | Erection supervision of LV, MV AC & DC Installations |
| Project: | Hellenic Petroleum - Refinery Upgrading |
| Client: | FWI S.r.l. |
| Country: | Greece |
| Date: | 2008-2010 |
| Job assigned: | Erection supervision for CCR Plant HELPE |
| Project: | Cyclades Interconnection Project |
| Client: | ALSTOM Grid |
| Country: | Greece |
| Date: | 2015 |
| Job assigned: | Design of LV AC & DC Installations |
| Project: | Skouries Copper – Gold project |
| Client: | ALSTOM Grid |
| Country: | Greece |
| Date: | 2015 |
| Job assigned: | Design of 150/20kV Substation |
| Project: | Louros Renovation Project |
| Client: | EMEK S.A. |
| Country: | Greece |
| Date: | 2017 |
| Job assigned: | Electrical Installations Basic & Detailed Design |
| Project: | S/S of Transmission Line |
| Client: | SIEMENS S.A. |
| Country: | Greece |
| Date: | 2017 |
| Job assigned: | Anthili 150/25kV Substation Electrical Design |
| Project: | S/S of Transmission Line |
| Client: | SIEMENS S.A. |
| Country: | Greece |
| Date: | 2017 |
| Job assigned: | Perivoli 150/25kV Substation Electrical Design |
| Project: | Shobak Wind Power Plant |
| Client: | VESTAS WIND SYSTEMS Spain |
| Country: | Jordan |
| Date: | 2018 |
| Job assigned: | 132/33kV Substation 44 MWp Electrical Design |
| Project: | Daehan Wind Power Plant |
| Client: | VESTAS WIND SYSTEMS Spain |
| Country: | Jordan |
| Date: | 2019 |
| Job assigned: | 132/33kV Substation 51.75 MWp Electrical Design |
| Project: | Abour Wind Power Plant |
| Client: | VESTAS WIND SYSTEMS Spain |
| Country: | Jordan |
| Date: | 2019 |
| Job assigned: | 132/33kV Substation 51.75 MWp Electrical Design |
| Project: | PV Plant – Microgrid power system |
| Client: | H.M. Vatopedi |
| Country: | Greece |
| Date: | 2019 |
| Job assigned: | PV Plant - MV Substations - Diesel G/Sets - Battery Storage - Microgrid autonomous system Electrical Design |
| Project: | PV Plant – Microgrid power systems |
| Client: | Mount Athos Community |
| Country: | Greece |
| Date: | 2021 |
| Job assigned: | 21 x PV Plants – 23 x MV Substations - 21 x Battery Storage - 21 x Microgrid autonomous systems Electrical Design |
| Project: | > 40 hydro power plants |
| Client: | ENEL, NANKO, NEGAAK, PPC, Techniki Energeiaki |
| Country: | Greece |
| Date: | 2000-2021 |
| Job assigned: | Design, Commissioning and Erection of the Control System (PLC, SCADA and Industrial Communications) |
| Project: | Industry support |
| Client: | TOSOH Hellas AEBE Chemical Industry |
| Country: | Greece |
| Date: | 2003-2021 |
| Job assigned: | Renovation of the Control System in 3 Departments (Dissolving, Stripping and Product Treatment) |
| Project: | Food Processing Lines and machines |
| Client: | Ten Brink Hellas S.A. |
| Country: | Greece |
| Date: | 2005-2021 |
| Job assigned: | Design, Commissioning and Erection of the Control System for the Food Machinery and Food Processing Lines |
| Project: | Mineral processing factory of Olympias |
| Client: | Hellas Gold S.A. |
| Country: | Greece |
| Date: | 2012 |
| Job assigned: | Design, Commissioning and Erection of the Control System for the flotation factory, Paste plant, Water treatment and aux systems in underground tunnels (PLCs SCADA & industrial communications) |
| Project: | Peach Compost Industry |
| Client: | VITOM S.A. |
| Country: | Greece |
| Date: | 2016 |
| Job assigned: | Design, Commissioning and Erection of the MCC and Control System of the new plant |
| Project: | Microgrid power system |
| Client: | H.M. Vatopedi |
| Country: | Greece |
| Date: | 2019 |
| Job assigned: | Microgrid Consisting of 4 D G/Sets, 1 PV park, 3 Biomass Co-Generators and Battery Storage. Control of all production and consumption |
| Project: | OMPUL project |
| Client: | Axis Medical |
| Country: | Greece - Israel |
| Date: | 2021 |
| Job assigned: | Design, erection and commissioning of a Medical Class B GMP Clean Room Automations |
| Project: | Wind Park Agios Georgios Island |
| Client: | ALSTOM Grid |
| Country: | Greece |
| Date: | 2016 |
| Job assigned: | Testing and commissioning of AC/DC Panels, 150kV LCC Panels, 150kV P&C Panels, 20kV Panels and substation automation system (SCADA) |
| Project: | TITAN Group - Sharrcem Kosovo Plant |
| Client: | ABB S.A. |
| Country: | Kosovo |
| Date: | 2017 |
| Job assigned: | Testing and commissioning of a new Main 6kV S/S |
| Project: | Cyclades Interconnection Project 150kV GIS S/S |
| Client: | GE Power S.A. |
| Country: | Syros Island - Greece |
| Date: | 2017 |
| Job assigned: | Testing and commissioning of AC/DC Panels, 150kV LCC Panels, 150kV Protection & Control Panels, 20kV Panels and S/S automation system (SCADA) |
| Project: | Cyclades Interconnection Project 150kV GIS S/S |
| Client: | GE Power S.A. |
| Country: | Lavrio side - Greece |
| Date: | 2017 |
| Job assigned: | Testing and commissioning of AC/DC Panels, 150kV LCC Panels, 150kV Protection & Control Panels, 400/150/30kV Auto Tranformer and Substation automation system (SCADA) |
| Project: | Cyclades Interconnection Project 150kV GIS S/S |
| Client: | GE Power S.A. |
| Country: | Mykonos Island - Greece |
| Date: | 2018 |
| Job assigned: | Testing and commissioning of AC/DC Panels, 150kV LCC Panels, 150kV Protection & Control Panels, 20kV Panels and Substation automation system (SCADA) |
| Project: | Ag. Dimitrios PPC Power Plant Unit III |
| Client: | ABB S.A. |
| Country: | Greece |
| Date: | 2018 |
| Job assigned: | Testing and commissioning of protection relays of 6kV MV panels and Generator Protections |
| Project: | Wind Park Amarynthos, Evia Island |
| Client: | ABB S.A. |
| Country: | Greece |
| Date: | 2018 |
| Job assigned: | Testing and commissioning of ABB MicroSCADA substation automation system |
| Project: | 150/33kV S/S of Wind Park Gratsiani, Kozani |
| Client: | Schneider Electric S.A. |
| Country: | Greece |
| Date: | 2019 |
| Job assigned: | Testing and commissioning of electrical substation |
| Project: | 13/33kV S/S 51.75MWp Wind Power Plant |
| Client: | VESTAS WIND SYSTEMS Spain |
| Country: | Daehan, Jordan |
| Date: | 2021 |
| Job assigned: | Testing and commissioning of HV substation |
| Project: | 132/33kV S/S 51.75MWp Wind Power Plant |
| Client: | VESTAS WIND SYSTEMS Spain |
| Country: | Abour, Jordan |
| Date: | 2021 |
| Job assigned: | Testing and commissioning of HV substation |
| Project: | R & D |
| Client: | Levitherm S.A., Stiebel Eltron |
| Country: | Greece |
| Date: | 1995 |
| Job assigned: | Detailed design of new water boilers with oil, gas and biomass fuel |
| Project: | R & D |
| Client: | Kamini S.A., DeltaTherm S.A. |
| Country: | Greece |
| Date: | 1997 |
| Job assigned: | Detailed design for new transportable steam diesel oil boilers for soil disinfection |
| Project: | Hellenic Petroleum PP Plant 176 kT/Y |
| Client: | TCM Sp.A. |
| Country: | Greece |
| Date: | 1999-2002 |
| Job assigned: | Erection supervision of U/G – A/G piping, HVAC Fire Fighting Installations, Steam Tracing |
| Project: | Ptolemaida steam power plant |
| Client: | RODAX S.A. Company |
| Country: | Greece |
| Date: | 1999 |
| Job assigned: | Detailed design of ash distribution and loading system to tracks at lignite mine |
| Project: | Megalopolis Power Plant |
| Client: | RODAX S.A. Company |
| Country: | Greece |
| Date: | 2008 |
| Job assigned: | Detailed design of ash transportation system for recuperation at IV steam power station |
| Project: | Lavrio gas turbine power plant |
| Client: | METKA S.A. Company |
| Country: | Greece |
| Date: | 2011 |
| Job assigned: | Detailed design of impressed current cathodic protection at the main aboveground cooling sea water pipe |
| Project: | I.P.P., Aspra Spitia |
| Client: | Aluminum of Greece S.A. |
| Country: | Greece |
| Date: | 2011 |
| Job assigned: | Detailed design of fire detection system, cathodic protection, diesel generator aux systems and automation, instrumentation frost protection and lightning protection for gas turbine power plant |
| Project: | P.P.C. Kardia steam power plant |
| Client: | RODAX S.A. Company |
| Country: | Greece |
| Date: | 2011 |
| Job assigned: | Detailed Design of Deionized water F/F system for HV oil T/F Firefighting pipe network for buildings at electrostatic filters |
| Project: | Agios Demetrios steam power plant |
| Client: | METKA S.A. Company |
| Country: | Greece |
| Date: | 2012 |
| Job assigned: | Detailed design of oil storage, pump station and oil pipe with steam heat tracing |
| Project: | Ilarion and Papadia, hydro power plant |
| Client: | RODAX S.A. Company |
| Country: | Greece |
| Date: | 2013 |
| Job assigned: | Detailed design of heating and air-conditioning systems at the electrical switchgear rooms at hydro power plant |
| Project: | Gas Power Plant |
| Client: | RODAX S.A. Company |
| Country: | Brazi, Romania |
| Date: | 2013 |
| Job assigned: | Detailed design of pipe racks and cable trays, instrumentation frost protection and fire detection |
| Project: | Gas Power Plant |
| Client: | RODAX S.A. Company |
| Country: | Korangi, Pakistan |
| Date: | 2013 |
| Job assigned: | Detailed design of fire detection system, HVAC at electrical and battery switchgear rooms and lightning protection |
| Project: | HV-MV Τ/F Repair Plant |
| Client: | P.P.C. |
| Country: | Greece |
| Date: | 2014 |
| Job assigned: | Detailed Design of mechanical apparatus for oil transformers repair works |
| Project: | Gas Power Plant |
| Client: | METKA S.A. |
| Country: | Samsun, Turkey |
| Date: | 2015 |
| Job assigned: | Impressed current cathodic protection for seawater pumps |
| Project: | Gas Power Plant |
| Client: | METKA S.A. |
| Country: | Al Basra, Iraq |
| Date: | 2015 |
| Job assigned: | Detailed design of fire detection and impressed current cathodic protection system for cooling water pipe |
| Project: | Ptolemaida steam power plant |
| Client: | RODAX S.A. Company |
| Country: | Greece |
| Date: | 2016 |
| Job assigned: | Detailed design of ash distribution and loading system to tracks at lignite mine |
| Project: | Power Plant |
| Client: | METKA S.A. |
| Country: | New Castle under Lymo, U.K. |
| Date: | 2017 |
| Job assigned: | Detailed design of oil and natural gas distribution piping |
| Project: | CHP Energy Center |
| Client: | Monastery of Vatopedi, Mount Athos |
| Country: | Greece |
| Date: | 2018-2020 |
| Job assigned: | Consulting, Engineering, Design, Project Costing, coordination, technical and financial permit studies, supervision |
| Project: | Industrial space heating |
| Client: | Various industries |
| Country: | Greece |
| Date: | 2010-2020 |
| Job assigned: | Design and installation of heating systems in industrial complexes with gas infrared heaters |